[et_pb_section fb_built="1" _builder_version="4.9.7" da_disable_devices="off|off|off" global_colors_info="{}" da_is_popup="off" da_exit_intent="off" da_has_close="on" da_alt_close="off" da_dark_close="off" da_not_modal="on" da_is_singular="off" da_with_loader="off" da_has_shadow="on"][et_pb_row _builder_version="4.9.7" global_colors_info="{}"][et_pb_column type="4_4" _builder_version="3.25.3" global_colors_info="{}"][et_pb_code _builder_version="4.13.1" custom_margin="||35px" link_option_url_new_window="on" global_colors_info="{}"]Download PDF[/et_pb_code][et_pb_text _builder_version="4.13.1" global_colors_info="{}"]

Summary

New Era Technology provided network services for a leading third-party logistics provider. This provider utilized a different Managed Services Provider and experienced a failed shipment in hardware from this MSP, in advance of a paramount site visit from their Executives, based overseas.

Challenge

The MSP shipped the provider’s hardware via 3-Day-Air instead of shipping overnight, and to the wrong address. Once the issue was identified, the freight was expedited to the correct address. Based on the positive relationship with New Era Technology, the provider worked with New Era’s vendor to bring in additional people over the weekend to ensure the hardware was installed and functioning properly

Solution

The process, which usually requires 2-weeks, turned into a fleeting two-day timeline. New Era’s technicians worked around the clock to ensure the site was ready for the overseas visit, to provide the ultimate customer experience.

Outcome

We were in a corner and New Era Technology came through in a large way. We experienced a successful visit and received nothing but compliments from our team and operations regarding New Era’s work.” — VP at Third-Party Logistics Provider

Download the full project highlight below.

[/et_pb_text][et_pb_code _builder_version="4.13.1" custom_margin="35px||" link_option_url="/wp-content/uploads/sites/5/2020/05/New-Era-Technology-Detroit-Pistons-Case-Study.pdf" link_option_url_new_window="on" global_colors_info="{}"]Download PDF[/et_pb_code][/et_pb_column][/et_pb_row][/et_pb_section]

PREVIOUS POST New Era Technology Named #49 on CRN’s 2023 Solution Provider 500 List
NEXT POST Ensuring Resiliency in a Hybrid Cloud Environment